18 results, showing 1 to 10
On 30 March 2021, the Australian Rail Track Corporation (ARTC) submitted a new variation application for the current Hunter Valley Coal Network Access Undertaking. The ACCC published its Final Decision to consent to ARTC's 30 March variation application on 2 June 2021.
On 3 March 2020, the Murray-Darling Basin Authority (MDBA) requested the ACCC provide its advice on the operation of sub-sections 12.02(2) to (4) of the Basin Plan water trading rules (the 12.02 provisions), to inform its review of these provisions as required under the Basin Plan 2012 (Cth). The ACCC provided this advice to the MDBA on 1 June 2020.
In response to a recommendation from the Independent Review of the Water Act 2007 in 2014, the Parliamentary Secretary to the Minister for the Environment wrote to the ACCC requesting advice on possible amendments to the Water Charge (Infrastructure) Rules 2010, Water Charge (Planning and Management Information) Rules 2010, and Water Charge (Termination Fees) Rules 2009.
On 18 August 2016 the Murray-Darling Basin Authority (MDBA) requested the ACCC’s advice on possible amendments to the Basin Plan water trading rules, which form Chapter 12 of the Basin Plan 2012 (Cth).
The ACCC provided its final advice on the water infrastructure charge rules on 26 June 2009.
On 7 November 2014, the ACCC commenced a public inquiry into varying the 2012 domestic transmission capacity service (DTCS) final access determination.
ACCC reports to the next generation networks discussions.
On 17 April 2014, the ACCC commenced a public inquiry into varying the final access determinations for the unconditioned local loop service (ULLS), line sharing service (LSS), wholesale line rental (WLR) service and local carriage service (LCS) to reflect the changes to the scope of fixed line services regulation.
In accordance with clause 4.1B of the final access determinations, clause 4.1A of the final access determinations expired on 7 December 2012.
On 16 December 2011 the ACCC released a final decision to vary the final access determinations to remove the exemption provisions for the WLR, LCS and PSTN OA declared fixed line services.