74 results, showing 11 to 20
On 8 May 2019, NBN Co lodged a proposed variation to its Special Access Undertaking (SAU) with the ACCC. The Competition and Consumer Act 2010 (CCA) allows NBN Co to give the ACCC a variation to an SAU already in operation. The ACCC accepted NBN Co’s current SAU on 13 December 2013, following an extensive consultation process.
On 1 August 2019, Australia Post provided the ACCC with a draft price notification proposing to increase prices of ordinary letters delivered at the regular timetable by 10%.
On 2 March 2018, ARTC lodged a replacement undertaking for the interstate rail network. This undertaking is to replace ARTC's 2008 undertaking, which expires 31 August 2018. The access undertaking covers the terms and conditions of access for parties seeking to run trains on the mainline standard gauge rail track owned or leased by ARTC.
On 22 June 2017, NBN Co formally withdrew its original SAU variation lodged with the ACCC on 27 May 2016. NBN Co simultaneously lodged a new proposed variation to its SAU (revised SAU variation).
On 9 December 2016, ARTC submitted the 2017 Hunter Valley Access Undertaking to the ACCC for assessment under Part IIIA of the Competition and Consumer Act 2010.
On 23 December 2015, ARTC submitted an access undertaking to the ACCC for assessment pursuant to Part IIIA of the Competition and Consumer Act 2010 (the Act). The access undertaking is in relation to the provision of access to the Hunter Valley Rail Network operated by ARTC in New South Wales.
Australia Post has provided the ACCC with a draft price notification regarding proposed price increases for letter services. Australia Post is proposing to introduce a basic postage rate of $1 for letters delivered at a new slower timetable, which allows up to an extra three business days for delivery to occur. Postage stamps for letters delivered at the current timetable cost 70 cents. Australia Post’s proposal also includes price increases for the delivery of large letters.
These letters from the ARTC document the progress of various reviews related to the 2011 Hunter Valley undertaking.
Airservices Australia (Airservices) has submitted a draft price notification to the ACCC proposing increases to its charges for terminal navigation (TN) and aviation rescue and fire-fighting (ARFF) services, effective from 1 July 2015.
On 28 September 2011 the ACCC accepted the 2011 Undertaking provided to the ACCC by CBH on 20 September 2011.