29 results, showing 1 to 10
On 3 March 2020, the Murray-Darling Basin Authority (MDBA) requested the ACCC provide its advice on the operation of sub-sections 12.02(2) to (4) of the Basin Plan water trading rules (the 12.02 provisions), to inform its review of these provisions as required under the Basin Plan 2012 (Cth). The ACCC provided this advice to the MDBA on 1 June 2020.
In response to a recommendation from the Independent Review of the Water Act 2007 in 2014, the Parliamentary Secretary to the Minister for the Environment wrote to the ACCC requesting advice on possible amendments to the Water Charge (Infrastructure) Rules 2010, Water Charge (Planning and Management Information) Rules 2010, and Water Charge (Termination Fees) Rules 2009.
On 18 August 2016 the Murray-Darling Basin Authority (MDBA) requested the ACCC’s advice on possible amendments to the Basin Plan water trading rules, which form Chapter 12 of the Basin Plan 2012 (Cth).
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
The ACCC provided its final advice on the water infrastructure charge rules on 26 June 2009.
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.
ACCC reports to the next generation networks discussions.
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).
The Water Charge (Infrastructure) Rules 2010 commenced on 12 January 2011 after being made by the Minister for Sustainability, Environment, Water, Population and Communities.
The amendments were registered on 16 February 2011 and commenced on 17 February 2011.