32 results, showing 21 to 30
On 7 November 2014, the ACCC commenced a public inquiry into varying the 2012 domestic transmission capacity service (DTCS) final access determination.
On 17 April 2014, the ACCC commenced a public inquiry into varying the final access determinations for the unconditioned local loop service (ULLS), line sharing service (LSS), wholesale line rental (WLR) service and local carriage service (LCS) to reflect the changes to the scope of fixed line services regulation.
Telstra’s migration plan requires it to develop six 'required measures' that relate to the operating processes Telstra will follow when disconnecting customers from its copper and HFC networks.
This project page contains information and correspondence about Telstra’s Roadmap and Work Plan for the development of the required measures.
This project page contains Telstra’s submission of required measures 1(a) and 1(b), which relate to ‘pull through’ NBN connection processes.
The Hunter Valley Access Undertaking (HVAU) accepted by the ACCC on 29 June 2011 requires ARTC to submit documentation for the purposes of an annual compliance assessment conducted by the ACCC.
This project page contains Telstra’s submission of required measures 2, 3, 4 and 6.
The ACCC carried out a compliance assessment and determined that ARTC has complied with pricing principles specified in clause 4.10 of the undertaking for the period 1 July 2011 to 31 December 2011.
In accordance with clause 4.1B of the final access determinations, clause 4.1A of the final access determinations expired on 7 December 2012.
On 6 March 2012, Telstra's Structural Separation Undertaking and Migration Plan came into force.
In July 2010, Telstra announced that it would be upgrading its existing copper network in South Brisbane to a fibre-to-the-premises network.