Final determination24 Sep 2015
ACCC final determination
On 24 September 2015 the ACCC released a final determination granting an exemption to WAPRES at its Bunbury port terminal facility.
On 24 September 2015 the ACCC released a final determination granting an exemption to WAPRES at its Bunbury port terminal facility.