Further draft decision23 Sep 2009
CBH withdrew the 14 April Undertaking on 24 September 2009 and on the same date lodged a second Undertaking.
On 23 September 2009 the ACCC published a further draft decision on each of the proposed Access Undertakings (the Undertakings) lodged by Co-operative Bulk Handling Ltd (CBH), GrainCorp Operations Limited (GrainCorp) and ABB Grain Ltd (ABB) during April 2009.
The views set out in these further draft decisions followed public consultation on the first draft decisions published on 6 August 2009.
ACCC further draft decision on CBH undertaking
Withdrawal and re-lodgement of undertaking
On 24 September 2009, CBH withdrew the Undertaking dated 14 April 2009 and re-lodged a revised Undertaking.